Standard Operation Procedure Dc Motor - Power Plant










STANDARD OPERATION PROCEDURE FOR 

ELECTRICAL DEPARTMENTCPP

DC Motors Operation 









  1. Objective.................................................................................................. 

  2. Scope........................................................................................................ 

  3. Responsibility .........................................................................................

  4. Input ........................................................................................................

  5. Output .....................................................................................................

  6. Process ....................................................................................................

  7. Process Performance Parameter and Process Control Parameter............

  8. Related Documents..................................................................................

  9. Safety Precautions ...................................................................................

  10. Environmental Precautions:.....................................................................



1.0 Purpose:
The purpose of operation procedure is to maximize the performance of equipment by ensuring that the equipment performs regularly and efficiently, by attempting to prevent the breakdowns or failures and minimizing the losses resulting from breakdowns or failures while starting the equipment.

2.0 Scope:
This SOP is applicable for standard Operation for the DC Motor.

3.0 Responsibility:
HOD Electrical Maintenance

4.0 Input
Related Standard operation procedure.

5.0 Output:
  •   Restored Equipment
  •   Updated Log Book
  •   Maintain the records

  • 6.0 Process:
    Sr.No

    Activity  Responsible
    1
    Organize PEPTALK before assigning the job
    page4image13592
    Engineer
    page4image14944
    2
    Check the motor Bed Bolt tightness and Coupling freeness by hand.
    Engineer
    3
    Ensure power supply is off.
    Electrician
    page4image23048
    4
    Check the armature and field resistance if the motor with Multimeter.
    Electrician
    5
    Check the brush holder tightness and also check the brush sitting clearance.
    page4image29400
    Engineer
    6
    Clean the Commutator & carbon brushes.
    page4image33320
    Electrician
    7
    Segments also check the pressure on brushes.
    page4image38064
    Electrician
    page4image39416
    8
    Techno coupling, connections, mounting checking.
    Electrician
    9
    Check the megger value of the motor power cable.
    page4image46088
    Electrician
    10
    Check the Cooling fan tightness or Cooling air blower motor available check the termination and megger value of the blower motor.
    Electrician
    11
    Check the motor termination, cable gland seating area and also tightness of the terminal block.
    page4image54416
    Electrician
    12
    Switch on the SFU/Breaker.
    page4image59040
    Electrician
    page4image60816
    13
    Take clearance from Turbine Engineer / shift in charge
    Engineer/ Shift in charge
    14
    Start the motor from locally and check the speed variation is correct timing as per the drawing.
    Electrician / Shift in charge
    15
    Check the pressure of the pump discharge at full rpm of the motor and stop the motor .
    page4image73064
    Electrician / Shift in charge
    page4image74680
    16
    Keep the motor in DCS with Auto mode for safety purpose and check once from Remote / DCS also
    Electrician / Shift in charge
    17
    Clean the work place & equipment’s after completed the job.
    Engineer/ Shift in charge 

    7.0 Process Performance Parameter and Process Control Parameter
    •   % deviation from Target Mean Time Taken to Repair
    •   Adherence to Equipment Checklist and running parameter of the motor (Current, Voltage, Bearing temperature and Vibration) should be, maintain in the records.Cost of Spares used or Replaced
    Check for Megger values with in specified limits. Check trip circuit healthiness for DC Motor.
    Check for starting and running loads during trial run. Check for any excessive heat generation in motor.

    8.0 Related Documents:

      
    Sr. No
    page5image14480
    Reference No. of Record
      
    Location of record

      
    Retention Time


    Title of Record

    page5image23256
    1
    Electrical logbook
    Shift office
    2
    Equipment history card
    page5image30728
    Electrical HOD
    3
    Equipment details of the control desk.
    page5image37160 page5image37640
    Electrical HOD




    9.0 Safety Precautions


    Sr. No

     
    Activity
     
    Responsibility
     page6image11632
    1
    Ensure Proper range of the Multimeter and Megger
    Engineer
    2
    Insulated general tools to be used.
    Electrician
    page6image19312
    3
    Ensure good housekeeping of maintenance site.
    Electrician
    4

    Chance of Getting the Personal Injury

    Electrician
    5

    Chance of Damaging the Equipments
    page6image30088
    Electrician
    6

    Follow the work instruction properly as given by the shift engineer or any higher authority

    Electrician
    7

    Every person is aware of the first aid procedure.

    Electrician
    8

    Class one permit should be taken from Safety department
    page6image44168
    Electrician
       
    10.0 Environmental Precautions
    NIL NIL 